A technical visit, not a sales call
We measure at your site: actual consumption, humidity and temperature conditions, and the right installation position. Then we deliver a written recommendation of model and capacity, and a quotation covering installation, warranty and cost per litre.
- 1
- Working day to respond to a request
- 4
- Written outputs from the visit
Four steps to a quotation
We call within one working day
A short call to understand the type of site and current consumption, and to set a date for the visit.
A site visit and measurement
Actual measurement of consumption and site conditions, and confirmation of the installation position, pipework route and electrical supply.
A recommended model and capacity
The right series and model for your site, with the output expected there specifically — not the published maximum.
A detailed quotation
Covering the unit, installation, warranty and service schedule, with a comparison against your current tanker and bottle costs.
Start with a study of your site
A technical visit that establishes the right capacity, the installation position and the expected consumption, and ends with a detailed quotation and a clear cost per litre.
- A site visit and an actual measurement of consumption
- A recommendation of the series and capacity suited to your site
- A detailed quotation covering installation and warranty
- A comparison against your current tanker and bottle costs
Frequent questions
Do the units work in Qatar’s climate?
The machine performs excellently throughout the entire year. Relative humidity in Qatar is high for most months of the year, and that is the condition this technology is suited to.
How much electricity does it use?
It varies by capacity and model, between 0.24 and 0.44 kilowatt-hours per litre. Consumption is calculated precisely in the site study and set against your current tanker and bottle costs to arrive at a real cost per litre.
How long does installation take?
Domestic units usually take a single working day once the site is prepared. For commercial and industrial systems the duration is set in the site study, according to the pipework and electrical work involved.
